Your Title Goes Here

Your Title Goes Here

Your Title Goes Here

Your Title Goes Here

Your Title Goes Here

Projects

Our Work

Polygon Gallery

The Polygon Art Gallery is a new 24,000 square foot space in North Vancouver, BC . This new facility was completed in 2017 and includes connections to the Lonsdale District Energy System.

Owner: Presentation Gallery House
Mechanical Consultant: Integral Group
General Contractor: Haebler Group

Our Work

UBC Hebb Building

The UBC Hebb Building Renewal is a LEED Gold renovation to an existing 1960’s facility. The six-story, 64,000 sqft building is home to UBC’s Department of Physics and Astronomy and includes teaching labs, a 375-seat lecture theatre, support spaces and classrooms. The building was seismically upgraded to meet current Code requirements and included new plumbing, heating and controls systems throughout as well as accessibility improvements.

Owner: University of British Columbia

General Contractor: Heatherbrae Builders Co. Ltd.

Our Work

Salish Secondary School

The 190,000 sqft Salish Secondary School is the Surrey School District’s largest secondary school. The school, which opened in September 2018, is home to 1,500 students in grades 8-12. The facility’s open concept design includes state-of-the-art collaborative learning spaces. The facility also includes a theatre, technology/engineering/design labs, art labs, a dance studio, two gymnasiums, multipurpose room, servery, computer labs, learning commons and science labs.

Owner: School District No. 36 (Surrey)
Mechanical Consultant: Integral Group
General Contractor: DGS Construction Ltd.

View More of our Projects

Vancouver Talmud Torah School

Vancouver Talmud Torah School underwent an addition to the existing elementary school, adding 45,000 square feet which included a gymnasium and an additional classroom wing. The addition was completed in 2017.

Owner: Vancouver Talmud Torah School Mechanical Consultant: Integral Group General Contractor: Haebler Group

Surrey Honda

Surrey Honda underwent a complete renovation of the existing dealership in Surrey, BC.

Owner: KDL Holdings Ltd.
Mechanical Consultant: Christopher Bozyk Architects
General Contractor: DGS Construction Ltd.

SIR SANFORD FLEMING ELEMENTARY SCHOOL REPLACEMENT

This project includes seismically replacing the existing school with a new building on the same site. The new school is built to LEED Gold standard and includes traditional classrooms, administration areas, open learning spaces a gymnasium and a 69-space child-care centre for children up to four years old on the third floor.

KPU – Chip and Shannon Wilson School of Design

The Kwantlen Polytechnic University Chip and Shannon Wilson School of Design project is a five-story, 65,000 sqft LEED Gold Institutional building. The building program includes production workshops, open studios, computer laboratories, multipurpose rooms, design studios, offices, galleries, service rooms and study spaces.

Owner: Kwantlen Polytechnic University

Mechanical Consultant: AME Group

General Contractor: DGS Construction Ltd.

Royal Vancouver Yacht Club

Royal Vancouver Yacht Club has undertaken the building of a 5,500 square foot accessory dock building on top of a marine pier.

Owner: Royal Vancouver Yacht Club Society
Mechanical Contractor: AME Group
General Contractor: Heatherbrae Builders Co. Ltd.

Contact Us

Location Street Name

+0 000 000 0000

email@email.com